"After nine years and approx. 22 million ball studs, our four Toellner loader/unloaders are still operating remarkably well on our four Mori-Seiki CNC lathes. Nine years of three shifts, five and six days a week, they have exceeded our expectations."
Ken Simmons
Sr. Mfg. Eng.
TRW
Commercial Steering Division
”We’ve had the Toellner system for about 2 months now. We increased our output by 3 times. We used to produce 450 conductor tubes a day and one person dedicated to load and unload. Now we have one person running 3 machines and putting out 1500 conductor tubes plus other parts.
The setup and maintenance on the machine could not be any easier. At first, my operator had doubts about the unit, but now he can't live without it!"
Nallu Paraman
Manufacturing Engineer
Thermadyne Holdings
Denton, TX
"The installation and startup of the loader system presented some very interesting challenges. By working together with Toellner, we were able to overcome all the obstacles relatively easy and quickly. Bottom line, I would have to say that of all the automation systems I have been involved with over the last 30 years, this has been the smoothest and quickest, getting from installation to flawless full production."
Mark Easterling
Mfg. Engineer
Stalcop L.P.
Thorntown, IN
"In the Lean Manufacturing Process, the elimination of non-value added waste (unloading and loading parts) is paramount to success. The installation of these robust machines helped us to convert this waste time into value added (assembly) time, increasing our output by 25-30% with no additional labor costs.
After the initial installation, the outstanding Customer Support we received from Toellner Systems was a refreshing change of pace from the normal workings in the marketplace today."
Brian Bodza
Mechanical Maintenance Supervisor
TPM Coordinator
Cardwell Westinghouse
A Wabtec Company
"We have been very pleased not only with the automation system that Toellner has provided us, but the support both before and after the sale. Our throughput on that particular work center has shown an average increase of over 20%. Because the output is now consistent, our daily scheduling has become much more predictable. We would not hesitate to involve Toellner Systems in future projects."
Brian Dachyk
Norlen, Inc.